Casa Kathryn is a contemporary style home with two 

bedrooms and two bathrooms in Tronadora, Costa Rica with

a beautiful view of Lake Arenal.

 

Now that we have access and all of the permits we can get started on the construction.  

The homesite has been choosen and cleared and the we have begun to layout the footprint for the house.

 

Here the crew is starting to dig out the footers.

 

In this picture the footers are done and ready to get rebar. 

                                                                 

Check out this aerial video we shot with our drone.

Here you can see the block work being done on the exterior walls. 

 

  The interior layout is done and ready to be blocked up.

 

and the block work is coming along well, soon we will pour some columns.

 

This is the front corner of the house, nice big windows to enjoy the view of the lake.

 

 The view from the kitchen area down the hallway.

 

The outside kitchen wall.

Now the block work is done, and it looks great! 

 

 What an amazing view from the living room.

 

Here is a look at the backside of the house.

 

 

This the hallway and the bathrooms.

 

This is the view from the kitchen. Now it is time to start the roof. It is really looking like a house!

 

 

The exterior is almost ready for finishes.

 

 

The roof is on! Now we can make some headway on the interior.

 

Here is another view of the backside of the house.

 

 Now we are getting started on interior finishes.

 

These guys work hard to get it right.

 

Sanding the plaster.

The windows are coming tomorrow!

 

Great The Windows are Done! 

 

 

The ceilings are in, a little sanding and then it's time to paint.

 

Here we are forming up the concrete counters.

 

 

The windows are nice, aluminum on white, very contemporary.

 

The exterior is nearly complete.

 

One last look Before the tile and paint go on. 

 

 

The gray slate tile came out very nice!

 

We are just about ready for doors and appliances.

 

Looking Good!

 

More pictures coming soon! 

Casa Jason 2015

The process normally starts with a client purchasing one of our many properties. In the images below our client has purchased a rural farm with fantastic views of the Arenal Volcano, the lake, and the surronding mountains. Then the LAREC team works cloesly with client to create the best possible design, homesite, and layout.

 

Once everyone is happy with the design and layout we begin by clearing the building site.

Lake Arenal Real Estate & Construction

 

Now that we have a suitable building site, it is time to start building something. So we begin with the footers.  

20150219 154303 resized 1

Work is Work, but on a day like this you have to stop and enjoy the view.

20150219 153642 resized 1 1

 

Then we have some days that aren't so nice, but it is great to see the block work getting started.

20150312 095435 resized

 

In Costa Rica the typical methode of construction is block between solid concrete column. We will lay block on top of the footings to the desired height and then come back and pour the columns. 

20150319 100603 resized

 

Another beautiful day with a fantastic view of the volcano. Now we can see the block walls reaching the height of the first floor. Next we will pour the columns, the header( or viga), and will start the second floor. 

20150323 131914 resized

 

Another beautiful day with gorgeous views of the mountains and volcano. In this image you can see the columns being formed up, when the columns are complete we will start the steel framing for the second floor. 

20150402 114215 resized 1

 

 Now that the concrete work is complete on the second floor, it's time to get the roof on. 

 

Here we are starting the steel framing of the roof structure. 

Casa Jason 12

 

  Once the roof framing is complete, we put down the roof panels, then start closing in the overhangs and facias. 

 

Here the workers are starting the stucco on the facia and the eves. Next we will start stucco in the walls. 

casa Jason 13

 

Once the roof is on we can start making some progress on the interior. Here is an image of the ceiling framing for the tongue and groove wood ceiling. 

Casa Jason 14

 

More progress being made on the interior. 

Casa Jason 15

 

Check out this video we took with our drone!

Here we are starting the madera negra natural wood column, very nice!
Starting the lower roof.

 

This is going to be a fantastic veranda.

 

The master bedroom balcony is going to have a great view. 

 

 

The interior finishes are looking very nice.

 

Things are moving along well. The lower roof is now on and the gutters on the upper roof. 

 

The floors are are in and soon we will start tile.

 

 

Here is a good look at the progress from the front .

 

The view from acroos the hill. 

 

Time to start thinking about paint colors! 

 

The stonework and madera negra post look really good together. 

 

The stonework will look great when it is finished. 

 

 Very cool entryway.

 

A look at the stonework in the bathroom. 

 

The tablea ceilings look so good. 

 

The master bedroom and closet. 

 

It was rainy on this day but the view from the MB is amazing. 

The master bathroom ceiling, is amazing!

 

The veranda will be a great place to hangout.

 

 

The stonework is looking amazing!

 

 

 

 

 

This tile is beautiful. 

 

The masterbathroom with stone and wood is fantastic! 

 

The exterior is really starting to come together.

 

More great stonework!

 

The view from inside the front door.

The view from the upstairs hallway.

 

Finishing up the exterior.

 

Time for the finishing touches.

 

It's all in the details.

 

Time for some furniture.

 

Great job on the rustic cabinets!

 

We would like to say thank you to Jason for letting us post the pictures of his construction.

Time to turn over the keys!

 

 

 

Advanced